PV, CHP and battery storage at one site: what MiSpeL means for the market premium and CHP bonus

Jonas Padberg 13.11.2026
Example site: at midday PV 80 kW, CHP 50 kW, site 20 kW, storage charging 100 kW, 10 kW into the grid; in the evening CHP 50 kW, site 40 kW, storage discharging 90 kW, 100 kW into the grid

Since the Federal Network Agency (Bundesnetzagentur) issued its MiSpeL determination on 1 October 2026, a battery storage system shared by a photovoltaic system (PV) and a combined heat and power plant (CHP) may also charge from the grid and feed into the grid. PV and biogas CHP plants funded under the Renewable Energy Sources Act (EEG) keep their market premium (Marktprämie) for their share of the electricity that reaches the grid via the storage system. A natural gas CHP plant funded under the Combined Heat and Power Act (KWKG) receives no CHP bonus (KWK-Zuschlag) for its share, only the exchange price. Requirements include three meters with quarter-hourly values, direct marketing and, until the end of September 2027, the consent of the grid operator and the metering point operator.

What has the Federal Network Agency decided?

Until now, a storage system shared by PV and CHP was hard to bill: once a kilowatt hour is in the storage system, you can no longer tell where it came from. Many grid operators have therefore not allowed such mixed storage systems to feed into the grid.

With the MiSpeL determination (market integration of storage systems and charging points), the Federal Network Agency sets out how electricity from a storage system is billed when the storage charges from on-site plants and from the grid at the same time. For sites where a PV system and another generation plant share one storage system, there is a dedicated special case: A6. It applies to a biogas CHP plant with EEG funding just as it does to a natural gas CHP plant with a CHP bonus.

The principle is simple: nobody tracks individual kilowatt hours. Measurements are taken at three points, so that each generation source is allocated to its uses. The result is unambiguous, traceable and verifiable by the grid operator.

Which meters do I need?

For special case A6, three meters are enough, all with quarter-hourly values:

  • Z1 at the grid connection measures what you draw from the grid and what you feed in.
  • Z2 directly in front of the storage system measures charging and discharging. Nothing else may be connected behind it.
  • Z4 at the PV system measures its generation.

Nobody measures your site’s consumption separately; it is calculated as the remainder. A CHP plant under the KWKG has its own meter anyway.

What matters is which plant has priority. If only the PV system has a generation meter, its priority is fixed. If PV and CHP each have one, you as the plant operator decide the priority, for an entire calendar year.

Metering concept for PV, CHP and storage: meter Z1 at the grid connection, Z4 at the PV system, Z2 in front of the storage system

Metering concept under special case A6: three meters with quarter-hourly values. Source: based on Bundesnetzagentur, MiSpeL determination, Annex 1, Fig. 9 on p. 56.

How is each kilowatt hour allocated?

Only a total arrives at the grid connection, and inside the storage system no kilowatt hour shows where it came from. The graphic shows two hours at an example site: at midday the storage system charges, in the evening it feeds in.

Example site: at midday PV 80 kW, CHP 50 kW, site 20 kW, storage charging 100 kW, 10 kW into the grid; in the evening CHP 50 kW, site 40 kW, storage discharging 90 kW, 100 kW into the grid

Two hours at an example site, measured at Z1, Z2 and Z4.

Three rules decide how the generated and purchased kilowatt hours are allocated:

1. Allocation when the storage system charges

If the storage system charges with electricity from the grid, the PV system and the CHP plant at the same time, the energy is allocated to the following sources in this order:

  1. Grid
  2. PV
  3. CHP

At midday the storage system charges 100 kWh. Nothing comes from the grid, so 0 kWh of grid electricity. The PV system generates 80 kWh, all of which counts as charged. The remaining 20 kWh come from the CHP plant.

2. Allocation when the site feeds into the grid

If the site feeds in electricity from the storage system, the PV system and the CHP plant at the same time, the feed-in is allocated to the following sources in this order:

  1. Storage
  2. PV
  3. CHP

At midday, 10 kWh go into the grid. The storage system is charging, and the PV output is already fully booked to the storage system. So the 10 kWh are CHP electricity, even though the sun is shining. In the evening, 100 kWh go into the grid: 90 kWh from the storage system and 10 kWh from the CHP plant.

3. The remainder covers consumption

Whatever a plant has neither charged nor fed in covers your site’s consumption. This way, every unit of generation is allocated to exactly one use.

The order “PV before CHP” applies if the PV system has priority. If the CHP plant has priority, the two swap places when charging and when feeding in.

What happens at the end of the month?

The rules above say who charged the storage system. Who owns the later discharge cannot be measured by any meter, because everything mixes inside the storage system. That is why billing happens once a month, with two pots: the funding pot holds what PV and CHP charged, after storage losses; the grid pot holds the grid electricity. Whatever the storage system feeds into the grid comes from the funding pot first. PV and CHP share it according to their share of charging.

In the example, PV charged 80 kWh and CHP 20 kWh. In the evening the storage system feeds 90 kWh into the grid (10 kWh of losses). PV is credited with 72 kWh of this, CHP with 18 kWh.

80 kWh PV and 20 kWh CHP charged at midday, 90 kWh into the grid in the evening, of which 72 kWh PV and 18 kWh CHP

Worked example: 100 kWh of charging becomes 90 kWh of feed-in, split by share of charging.

What do PV and CHP receive for their electricity?

The funding a kilowatt hour receives depends on its path and on whether your CHP plant is funded under the EEG or the KWKG:

  • PV under the EEG: directly into the grid, exchange price + market premium; via the storage system into the grid, exchange price + market premium on the PV share; into consumption, no funding.
  • Biogas CHP under the EEG: directly into the grid, exchange price + market premium; via the storage system into the grid, exchange price + market premium on the CHP share; into consumption, no funding.
  • Natural gas CHP under the KWKG: directly into the grid, exchange price + CHP bonus; via the storage system into the grid, exchange price only; into consumption, CHP bonus up to 100 kW (lower rate), above that only in special cases.

Your direct marketer earns the exchange price in the quarter hour of feed-in. Grid electricity in the storage system receives no funding; if it goes back into the grid, the levies (Umlagen) do not apply. The Federal Ministry for Economic Affairs plans to abolish the bonus on self-consumed electricity from CHP plants up to 100 kW with the next KWKG amendment (key points of September 2026, p. 8, in German); this is not yet law.

For stored electricity, what counts is the time it is fed in. PV electricity charged at midday at a negative price and fed in during the evening therefore receives the premium. The CHP bonus, by contrast, no longer applies once the exchange price is zero. Read more in the article No EEG remuneration at negative electricity prices.

Which requirements apply?

For the rules to apply, your site has to meet several conditions:

  • Direct marketing: PV and a biogas CHP plant must be in direct marketing (with or without EEG funding), with at least one of the plants receiving the market premium. A feed-in tariff is ruled out.
  • No purchase by the grid operator: a CHP plant may not have its electricity purchased by the grid operator either. It sells it via a direct marketer.
  • Own balancing group: the site’s feed-in runs through its own balancing group (Bilanzkreis), i.e. its own account for electricity volumes on the power market. A sub-balancing group with your direct marketer is sufficient.
  • Annual market value: the market premium is calculated using the annual market value. Older plants whose premium has so far been based on the monthly market value switch to the annual market value.
  • No CHP plant from a tender: a CHP plant that won its bonus in a tender (more than 500 kW up to 50 MW) must feed in all of its electricity. It may not charge the storage system or supply the site; otherwise it loses its bonus for the entire calendar year.
  • Transition period: until 30 September 2027 you need the consent of your grid operator and your metering point operator. From October 2027 consent is no longer required; grid and metering point operators must then enable the billing. Read more in the article MiSpeL becomes binding.

This makes it possible, for example, to combine PV with a market premium and a natural gas CHP plant in direct marketing, or PV and a biogas CHP plant, both with a market premium.

Conclusion

Special case A6 clearly sets out how PV, CHP and a shared storage system are billed. PV and a biogas CHP plant keep their market premium for electricity that reaches the grid via the storage system. A natural gas CHP plant under the KWKG loses its bonus only for its share of the stored electricity. Some points still need to be agreed with the grid operator for a natural gas CHP plant, for example how much CHP electricity counts as fed in directly while the storage system is feeding in at the same time. The storage system may also trade on the power market, and every kilowatt hour can be traced. Anyone planning a storage system at a site with a CHP plant should calculate it according to these rules and clarify the requirements with the grid operator early on. You can now size your battery together with a CHP plant in our calculator.

Sources

As of 13 November 2026. All sources in German.

FAQs

Frequently asked questions about PV, CHP and storage

Yes. Grid electricity in the storage system receives no funding. In return, the levies do not apply to the part the storage system feeds back into the grid or to its share of storage losses; if the storage system delivers grid electricity to your site, they apply as with any grid purchase. It takes nothing away from PV and CHP, because the funding pot is emptied first at the end of the month.

No. The KWKG does not provide for intermediate storage, and the Federal Network Agency makes clear in the MiSpeL determination that its rules do not result in a bonus for stored electricity. The CHP share of stored electricity earns only the exchange price.

Yes. A biogas CHP plant with EEG funding falls under the same special case A6 as a natural gas CHP plant. Unlike the latter, it keeps the market premium for its share of the stored electricity. It must be in direct marketing; it does not work with a feed-in tariff.

You need three meters with quarter-hourly values: at the grid connection, directly in front of the storage system and at the PV system. Whether your existing meters can do this is something to clarify with your metering point operator.

Not under the rules in this article. With a feed-in tariff, stored electricity keeps its remuneration only if the storage system charges exclusively from renewable plants for the entire calendar year, i.e. neither grid electricity nor electricity from a natural gas CHP plant. For anything else, the PV system must switch to direct marketing, which is possible on the first day of any month.

The determination dates from 1 October 2026. Until 30 September 2027 you additionally need the consent of your grid operator and your metering point operator; after that it is no longer required.

More Articles